词语吧>英语词典>backlog翻译和用法

backlog

英 [ˈbæklɒɡ]

美 [ˈbæklɔːɡ]

n.  积压的工作
vt.  (使)积压; 储存

复数:backlogs 过去分词:backlogged 现在分词:backlogging 过去式:backlogged 第三人称单数:backlogs 

BEC计算机

Collins.1 / BNC.14585 / COCA.14476

牛津词典

    noun

    • 积压的工作
      a quantity of work that should have been done already, but has not yet been done

      柯林斯词典

      • N-COUNT 积压的事情;未完成的工作
        Abacklogis a number of things which have not yet been done but which need to be done.
        1. There is a backlog of repairs and maintenance in schools.
          对各学校的修缮和维护工作积压了一堆。

      英英释义

      noun

      • an accumulation of jobs not done or materials not processed that are yet to be dealt with (especially unfilled customer orders for products or services)
        1. something kept back or saved for future use or a special purpose
            Synonym:reservestockpile
          1. the large log at the back of a hearth fire

            verb

            • accumulate and create a backlog

              双语例句

              • This is a waste of valuable transmission and processing bandwidth and can cause an unacceptable replication backlog to develop.
                这是一个对宝贵的传输和处理带宽的浪费并且可能导致发展出不可接受的复制日志的积压。
              • But if the suppliers own products backlog, and will take the same way in online auctions.
                而且如果供货商自己的产品积压,也会采取同样的方式在网上拍卖。
              • There is a backlog of repairs and maintenance in schools.
                对各学校的修缮和维护工作积压了一堆。
              • Sooner or later, this backlog of ST companies will have to be addressed.
                这批st企业迟早要得到处理。
              • First, create a Sprint Backlog iteration plan.
                首先,创建一个SprintBacklog迭代方案。
              • Or there's a major backlog at an important filing cabinet.
                或在重要文件柜中有一件重要的却被积压的工作;
              • Such changes and any missing or incorrect functionality were added to the product backlog for the next sprint.
                这些修改和任何缺失的或错误的功能都添加到下一次sprint的产品待办事项中。
              • Primarily, a small requirements backlog greatly enhances your responsiveness to customers.
                首先,一个小规模需求积压能大大增强您对客户的响应能力。
              • Some teams estimate the size of all of the items in their backlog prior to any development.
                有些团队在任何开发之前都要对他们积压中所有条目的大小进行评估。
              • It is normal to have a lot of user stories in your release backlog.
                在发行版的计划安排中,通常包含了大量的用户描述。