词语吧>英语词典>fastenings翻译和用法

fastenings

英 [ˈfɑːsnɪŋz]

美 [ˈfæsənɪŋz]

n.  (尤指衣服的)扣处,扣法
fastening的复数

柯林斯词典

  • N-COUNT 紧固件;扣件
    Afasteningis something such as a clasp or zip that you use to fasten something and keep it shut.
    1. The sundress has a neat back zip fastening.
      这件背心裙背部有一个巧妙的拉链。

双语例句

  • De-stressing shall consist of removing all the rail fastenings along the length of a rail panel.
    去应力应包括拆除沿钢轨板长度上的所有钢轨紧固件。
  • P-TEC provides sleepers for various systems and rail fastenings.
    TEC可以提供各种轨枕及轨道紧固件。
  • Block diagrams for a software to calculate the stress in various parts in detailed members and for the estimation of fatigue life of the fastenings, to facilitate computation on PC computers are included.
    文中还提供了适合微机使用的结构连接件细节应力分析和疲劳寿命估算的计算机程序框图。
  • It introduced the design of plastic fastening piece by injection moulding, including the material selection, fastening principles, basic types, and the key points of dimensions and shape as well as the applications of fastenings.
    介绍常用注塑成型连接件的材料选择、连接原理、基本类型、尺寸和形状设计要点及实际使用情况等。
  • This paper build up a prediction model for disassembling and assembling time of fastenings upon analysing, weighing, and regressing all concerned affecting factors.
    通过分析紧固件拆装作业过程,探索出了影响拆装作业时间的诸因素,并对所有的影响因素进行分析、权衡和回归,建立紧固件拆装作业时间的预计模型。
  • The sails are not responding to our pull on the ropes; the fastenings must got twisted somehow.
    现在我们用绳索拉不动风帆,一定是有些扣拴不知怎么地被扭曲了。
  • A distribution interval for the shearing stiffness of the bolts is drawn by reliability analysis, which may serve as a technical foundation for the strength analysis of the bolt fastenings.
    通过可靠性分析方法,得出该种连接件螺栓刚度的分布区间,为连接件的可靠性内力分析提供技术基础。
  • Analysis of Shearing Load-Carrying Capacity of Post-Installed Fastenings Anchor Group System in Concrete Structures
    混凝土结构后锚固群锚系统抗剪承载力分析
  • Following the installation of the temporary support, on both side of RC column, we set steel column to which the upper loads could be transmitted by a node made by using the post-installed fastenings technology.
    在迅速设置了临时支撑后,我们在柱两侧增设钢柱,并应用后锚固技术制作转换节点,将上部荷载传递到增设的钢柱上。
  • Research on Some Problems About Technology of Post-installed Fastenings in Concrete Structures
    混凝土结构后锚固连接技术若干问题的研究