词语吧>英语词典>gob翻译和用法

gob

英 [ɡɒb]

美 [ɡɑːb]

n.  (粗鲁语)嘴; 少许(黏湿的物质); 大量
v.  吐口水; 啐唾液

复数:gobs 现在分词:gobbing 第三人称单数:gobs 过去分词:gobbed 过去式:gobbed 

BNC.27220 / COCA.21768

牛津词典

    noun

    • (粗鲁语)嘴
      a rude way of referring to a person's mouth
      1. Shut your gob! (= a rude way of telling sb to be quiet)
        闭嘴!
    • 少许(黏湿的物质)
      a small amount of a thick wet substance
      1. Gobs of spittle ran down his chin.
        一滴滴口水顺着他的下巴往下流。
    • 大量
      a large amount of sth
      1. great gobs of cash
        大量现金

    verb

    • 吐口水;啐唾液
      to blow saliva out of your mouth

      柯林斯词典

      • N-COUNT 嘴
        A person'sgobis their mouth.
        1. Shut your gob.
          闭上你的嘴。
      • N-COUNT (黏性液体的)少许
        Agob ofa thick, unpleasant liquid is a small amount of it.
        1. ...a gob of spit.
          一口唾沫
      • VERB 吐,啐(唾沫)
        If someonegobs, theyspit.
        1. At a concert in Leeds, some punks gobbed at them and threw beer cans.
          在利兹举办的一场演唱会上,一些小流氓朝他们吐口水,扔啤酒罐。
      • N-COUNT 一块;一团
        Agob ofsomething is a lump of it.
        1. ...a gob of ice.
          一块冰
      • N-PLURAL 大量
        Gobs ofsomething means a lot of it.
        1. We're getting input from gobs of sources.
          我们从多方渠道得到信息。

      英英释义

      noun

      双语例句

      • Deformation analysis and treating measures to gob areas of coal mine under freeway
        高速公路下煤矿采空区变形分析及其治理
      • Application of Central Loop Transient Electromagnetic Method in Coalmine Gob Subsidence Area Prospecting
        中心回线瞬变电磁法在煤矿采空塌陷区的探测应用
      • Numerical Simulation of the Seepage Characteristics of Three-Phase Foam in the Gob Running beer gathers no froth.
        三相泡沫在采空区中渗流特性的数值模拟流着的啤酒堆不起泡沫。
      • Experimental Study and Numerical Analysis on Gas Dispersion Regularity in Gob
        采空区气体弥散规律的试验研究及数值分析
      • Based on this case, through filling the gob area by means of chamber blasting, the requirement of protective top-layer for slicing and caving can be achieved.
        针对这一情况,从药室爆破放顶充填采空区,从而达到分层崩落法采矿的护顶层要求。
      • Gob collapse is the most serious geological disaster type in Mencheng Town, Beijing.
        采空地面塌陷是门城镇地区危害性最严重的地质灾害类型。
      • Practice showed that high pre-stress anchored bolt with high strength was effective method for controlling deformation of deep coal roadway with combined roof above gob.
        实践证明,高预应力高强锚杆组合的围岩强化控制技术是控制深井厚复合顶板采空区上方煤巷围岩变形的有效方法。
      • Using theoretical analysis and simulation experiment, the influence of gob shield angle on top coal fracture angle and the equilibrium feature of arched structure above gob shield have been studied.
        分析了掩护梁角度对顶煤破断角及放煤口上方各种拱形结构平衡特征的影响,得出了综放支架掩护梁角度是顶煤回收率的重要影响因素的结论。
      • Hereby the safety of the combined mining of thin seams under the close gob water was evaluated.
        根据分析的结果评价了临界距离老空水下薄煤层联合开采的安全性。
      • This paper analyzed and calculated width of coal pillar for driving roadway along gob.
        对沿空掘巷时煤柱的留设问题进行了分析和计算。